GO Transit Track Standards Amendment Record |
Date
|
Subject
|
Description/Dwg Ref.
|
February 8, 2024 |
GO Transit Track Standard Plans |
Switch Stands and Track Signs
1.
GTS-0700 - Initial version established.
2.
GTS-0726 - Initial version established.
Transition & Compose Rails (previously Transition Rails category)
1.
GTS-1112_1 - Initial version established.
2.
GTS-1112_2 - Initial version established.
3.
GTS-1112_3 - Initial version established.
4.
GTS-1112_4 - Initial version established.
End of Track Devices (new category)
1.
GTS-2214 - Initial version established.
Rail Anchors and Clips
1.
GTS-1322_1 - Removed Pandrol e2009 clip, updated stamping details.
2.
GTS-1322_2 - Updated stamping details.
Concrete Ties
1.
GTS-2004
- Updated Note 1 under "Rail Fastenings" to include Vossloh e2055 rail
clip. Added dimension for inside face to inside face of outside
shoulders measured at the base of the shoulder (concrete surface).
2.
GTS-2007
- Updated Note 1 under "Rail Fastenings" to include Vossloh e2055 rail
clip. Added dimension for inside face to inside face of outside
shoulders measured at the base of the shoulder (concrete surface).
Roadbeds and Track Ballast Sections
1.
GTS-2204_1
- Updated ditch, subballast, and signal trench details.
2.
GTS-2204_2
- Updated ditch and subballast details, added access road section.
3.
GTS-2205 - Updated ballast dimensions and quantities, added steel
tile section.
|
February 8, 2024 |
Material Specifications - Concrete Tie Specification |
Revision 01 of the
Metrolinx Concrete Tie Specification
allows some flexibility in the production of monoblock
concrete ties and addresses equivalency in the rail
fastening system as well as some updates to align with the
most current version of the AREMA manual Chapter 30,
Part 4 Concrete Ties. |
October 3, 2023 |
GO Transit Track Standards - Ground Disturbance Excavation |
Added:
Ground Disturbance and Excavation FAQ |
August 25, 2023 |
GO Transit Track Standards - Excavation Permit |
Added:
Excavation Permit |
August 17, 2023 |
GO Transit Track Standards - Excavation Zone Calculator |
Added:
Excavation Zone Calculator |
September 29, 2023 |
Work Plan Methodology Template |
Updated
Work Plan Methodology Template. |
March 23, 2023 |
GO Transit Track Standards |
Added
Bulletin 010 - Various Sections_2023-03-10 |
December 2, 2022 |
GO Transit Track Standards |
Added
Bulletin 009 - Distribution of ties and
track material |
October 27, 2022 |
GO Transit Track Standards Plans |
|
October 27, 2022 |
GO Transit Track Standard |
Added
Bulletin 008 - Various Sections_2022-09-04 |
July 25, 2022 |
GO Transit Track Standards Requirements |
Uploaded
Fencing and Anti-Trespassing Requirements R01 - Appendices Included
and
Vegetation Maintenance Requirements |
March 31, 2022 |
GO Transit Track Standards Bulletin 007 |
Added
Bulletin 007 - Accountability Transfer - Signed |
January 27, 2022 |
GO Transit Track Standards - Metrolinx Approved Track Ballast Supplier
List |
Added
Metrolinx Approved Track Ballast Supplier List |
November 18, 2021 |
GO Transit Track Standards - Bulletin 006 - Various Sections (4 Nov.
2021) |
Added
Bulletin 006 - Various sections |
April 13, 2021 |
GO Transit Track Standards
Uploads to match standards and forms from MyLinx |
Uploaded
Handover Forms from MyLinx
Uploaded
CROR Forms from MyLinx
Uploaded
Right of Way Guidelines from MyLinx
Uploaded
Concrete Tie Specification from MyLinx |
September 02, 2020 |
GO Transit Track Standards plans |
Updated
GTS-1108_1_REV2;
GTS-1108_2_REV2;
GTS-1108_3_REV2 |
September 02, 2020 |
Bulletin 005 - Multiple Sections |
Added
Bulletin 005 - Multiple Sections |
July 07, 2020 |
GO Transit TWSI Bulletin 001-Lone Worker and Safety Watch Clarification |
Added
GO Transit TWSI Bulletin 001-Lone Worker and Safety Watch Clarification |
June 03, 2020 |
GO Transit Track Worker Safety Instructions |
Added
GO Transit Track Worker Safety Instructions |
June 03, 2020 |
Rail Corridors Infrastructure Handover Protocols |
Added
Rail Corridors Infrastructure Handover Protocols |
November 1, 2019 |
Crashed Rock Track Ballast Specification |
Revision 02 of
Crashed Rock Track Ballast Specification |
October 16, 2019 |
GO Transit Track Forms |
Added
GO Transit Track Forms |
August 20, 2019 |
Bulletin 001 -
GO Transit Track Welder Manual - Field Welding |
Added Bulletin 001 -
GO Transit Track Welder Manual
- Field Welding |
July 5, 2019 |
GO Transit Track Standard Plans |
Revision 01 of GO Transit Track Standard Plans |
March 22, 2019 |
GO Track Standards Bulletin 004 |
Removed GO Track Standards Bulletin 004 |
March 22, 2019 |
GO Track Standards Bulletin 003 |
Removed GO Track Standards Bulletin 003 |
March 22, 2019 |
Installation of Turnouts and Installation Stagger of Insulated Joints |
Update Bulletin 002
Installation of Turnouts and Installation Stagger of Insulated Joints |
January 11, 2019 |
Temporary Crossing Package |
Added
Temporary Crossing Package |
September 21, 2018 |
Track Work during Hot Weather and Excavations Adjacent to Track |
Added
Bulletin 001 - Track Work during Hot Weather and Excavations Adjacent to
Track |
September 11, 2018 |
Track Inspection Form - Derails RH, LH Turnout |
Moved from Standard Drawings to GO Transit Track Standards section
Track Inspection Form - Derails RH, LH Turnout |
September 11, 2018 |
Crushed Track Ballast Specification |
Moved from Standard Drawings to GO Transit Track Standards section
Crushed Track Ballast Specification |
September 07, 2018 |
GO Transit Track Welder Manual |
Added
GO Transit Track Welder Manual |
August 27, 2018 |
Work Plan Methodology Template |
Added
Work Plan Methodology Template |
August 27, 2018 |
Work Plan Methodology Template - User Manual |
Added
Work Plan Methodology Template - User Manual |
May 18, 2016 |
GO Transit Track Standards (RC-0506-02TRK) |
Launch of GO Transit Track Standards (RC-0506-02TRK) |
June 26, 2018 |
GO Transit Track Standard Plans |
Launch of GO Transit Track Standard Plans |
June 29, 2018 |
GO Transit Track Standards (RC-0506-02TRK) |
Revision 01 of
GO Transit Track Standards (RC-0506-02TRK) |