Standard Drawings and Specifications Amendment Record

Date

Subject

Description/Dwg Ref.

September 29, 2023 Asset Lifecycle Management Standards Updated: Facilities Asset Information and Data Dictionary (MX-ALM-STD-003)
September 14, 2023 Design Standards Updated: STS-001 Rev01 Bulletin Operations and Maintenance Requirements Station Services.


September 14, 2023 Architectural Standard Drawings and Specs Updated: Mini Platform-Island Platform MINI-001.
Document updated and title change from Bus Bay Guideline to Bus Infrastructure Drawings.

August 14, 2023 Asset Lifecycle Management Standards Updated: MX-ALM-STD-002

Following are the changes:
- Asset class Span is included in the dropdown list.
- Civil culvert definition added to the 4.0 - Functional Hierarchy notes.
- Added instructions for Warranty and Location X,Y in 9.3 MAL-Civil tab.
July 20, 2023 Asset Lifecycle Management Standards Updated: MX-ALM-STD-005 Signals Asset Information and Data Dictionary
July 27, 2023 CADD BIM Drawing Standards Updated: CAD Information Package (CIP)
Replaced: Metrolinx CADD BIM Standard Manual Rev 03 with Metrolinx CADD/BIM Standards Manual Rev 003 (MX-ALM-STD-004)
Uploaded: CADD BIM Standard Manual Rev 003 Errata
June 29, 2023 Business Technology Standards/I&IT Telecommunications and System Standard Asset name changed from "Business Technology Standards" to "I&IT Telecommunications and System Standard".

Updated: MX-IIT-STD-001
June 16, 2023 System Engineering Assurance Added new standard documents:
MX-SEA-STD-100 RAMS Process Standard
MX-SEA-PD-104 Preliminary Railway Level System Definition PD
MX-SEA-PD-105 Preliminary System Definition PD
MX-SEA-PD-106 System Definition PD
MX-SEA-PD-111 Risk Assessment Report PD
MX-SEA-PD-112 Safety Requirements Specification PD
MX-SEA-PD-117 RAM Analysis Process PD
MX-SEA-PD-119 RAM Plan PD
MX-SEA-PD-120 RAM Analysis Report PD
MX-SEA-PD-121 RAM Requirements Specification PD
MX-SEA-PD-122 RAM Subsystem Requirements PD
MX-SEA-PD-123 RAM Validation Plan PD
MX-SEA-PD-124 RAM Test Specification PD
MX-SEA-PD-125 RAM Validation Report PD
MX-SEA-PD-126 Failure Reporting Analysis and Corrective Action System PD
MX-SEA-PD-127 Operations Plan PD
MX-SEA-PD-128 Maintenance Plan PD
MX-SEA-PD-129 Training Plan PD
MX-SEA-PD-130 Commissioning Plan PD
MX-SEA-PD-131 Acceptance Report PD
MX-SEA-PD-132 Integration Plan PD
MX-SEA-PD-133 Integration Report PD
MX-SEA-PD-138 RAM Requirements Validation Report PD
MX-SEA-PD-140 Safety Subsystem Requirements PD
MX-SEA-PD-142 Operations Procedure PD
MX-SEA-PD-143 Maintenance Procedure PD
MX-SEA-PD-144 Training Procedure PD
MX-SEA-PD-145 Commissioning Procedure PD
June 12, 2023 FEA-001 Detectable Tile Installation Update Updated FEA-001 Bulletin to reflect changes below:

Updated drawing: PC-002
June 12, 2023 Detectable Edge Platform Curb Title changed from Detectable Edge Platform Curb to Rail Platform Curb and Tactile Tile Installation.

Updated Drawings: New Tactile Tile Installation on New Rail Platform Curb PC-001 Rev 2. and New Tactile Tile Installation on Existing Rail Platform Curb PC-002 Rev 2.
June 2, 2023 System Engineering Assurance Added: MX-SEA-TOR-001 Metrolinx System Review Panel (SRP) Terms of Reference (ToR)
May 11, 2023 Asset Lifecycle Management Standards - MX-ALM-STD-001 Updated: MX-ALM-STD-001 Asset Information Standard
May 9, 2023 Asset Lifecycle Management Standards - MX-ALM-STD-003 Updated: MX-ALM-STD-003 Facilities Asset Information and Data Dictionary
March 31, 2023 Mechanical Amendment to GO DRM - Bulletin 015

Updated Specifications:
Elevator, Fire Protection Sprinkler System, General Service Compressed Air System, Glycol Solution Snow Melting System, Hydronic Radiant Floor Heating System, Natural Gas Piping System, Plumbing Equipment
 
Updated drawings:  M-400, 402 & 403 Snow Melt Details,  M-100 Wall Mounted Non - Freeze Hose Bib Detail, M-200 Submersible Pump and Sump Pit Detail, M-300 Pipe Heat Tracing Detail 
 
March 23, 2023 Electrical Amendment to GO DRM - Bulletin 014

Updated specifications:
Backup Power Supply Generator, Circuit Breakers and Fuses, Disconnect Switches, Dry Type Transformer, Electrical Conductors and Cables, Electrical General Requirement, Electrical Identification and Nomenclature, Electrical Receptacles and Plugs, Inverter Rectifier and Charger, Lighting and Controls, Liquid Filled Transformer, Low Voltage Switchgears, Metal-Clad Switchgears, Motor Control Centers, Motor Starters and Contactors, Occupancy Sensors, Outdoor Load Bank, Splitter Boxes, Junction Boxes, Pullboxes and Cabinets, Switchboards and Panelboards, Transfer Switch, Uninterruptible Power Supplies

Updated drawing: LS-06-001 6m Pole for Speakers, Lights and Signs Elevation and Details

New drawings: LS-06-001.1 6m CCTV Pole Elevation and Details,
LS-06-002.1 6m CCTV Pole Base Plate Covers and Details,
LS-06-003.1 6m CCTV Pole Dimensions Reinforcements and Wobble Joint Details,
LS-06-004.1 6m CCTV Pole Setting Template and Base Mounting Details
March 13, 2023 CADD BIM Drawing Standards Removed old drawing templates, CPG Process Map Templates, CPG BIM Implementation Plan Template
Updated BIM Execution Template, CADD BIM Standard Manual, Master Information Delivery Template
Added new CAD Information Packages (CIP)
See CADD BIM Drawing Standards
August 22, 2022 Architectural Standard Drawings and Specifications Replace GO Standard Waste Bin / Recycling Container
August 17, 2022 Rolling Stock Standard Reformat Bus Specifications, and upload Wheelchair Lift Specifications
July 29, 2022 Asset Lifecycle Management Standards Update new version of CKH-ASMT-FRM-002-AssetDocControlList-TMP
June 15, 2022 Electrical & Communication Remove Two Way Communication Devices folder and its contents
June 10, 2022  Mechanical Revised Fire Protection Sprinkler System, Plumbing Fixtures, HVAC Piping and Pumps, Glycol Solution Snow Melting System, Drawing List
Upload Sample Boiler Room Layout
May 13, 2022 PRESTO Remove PRESTO heading (obsolete)
May 13, 2022 Ticket Vending Machines Remove:
TVM-001_Interior-Exterioir Base Details (obsolete)
TVM-002_Electrical Details (obsolete)
TVM-003_Electrical Details 2 (obsolete)
May 13, 2022 GO Bus ENV 500 Low Height 12.8 m Upload DDL-ADL E500 Bus, Lo-Top Specifications
May 06, 2022  Asset Lifecycle Management Standards Upload CKH-ASMT-FRM-002 and CKH-ASMT-FRM-005
April 27, 2022 Asset Lifecycle Management Standards Update new version of MX-ALM-STD-003
April 13, 2022 PRESTO Removed PRESTO documents (4) as they are outdated - PRESTO Installation and Connectivity, PRES-001, PRES-002, and PRES-003
April 06, 2022 GO Bus D4500 Removed D4505 Specs
March 25, 2022 RAMS / System Engineering Assurance Update version of MX-SEA-STD-006 RAMS Risk Assessment Process
March 21, 2022 Enviro 500 GO Bus Removed '12.8m' and '12.8m LH Body' from ENV500 Series as these bus specs are no longer applicable
March 15, 2022 RAMS / System Engineering Assurance Renamed RAMS to Systems Engineering Assurance
Replaced RAMS 1 - RAMS 5 with MX-SEA-STD-001, MX-SEA-STD-002, MX-SEA-STD-003, MX-SEA-STD-004, MX-SEA-STD-005
Added MX-SEA-STD-006
February 28, 2022 GO Bus D4500 Specs Updated D4500 Specs with new version
February 24, 2022 Detectable Edge Platform Curb Replaced versions of PC-001 Precast Concrete Platform Curbs Type1 Typ Cap and Base and PC-002 Precast Concrete Platform Curbs Type 2 Tactile Tile System
February 19, 2022 Asset Data and Information Standards Replaced MX-ALM-STD-003 with MX-ALM-STD-003 (2022 Feb 09)
October 05, 2021 Electrical revised 26 0521 Electrical Conductors and Cables Rev01
April 13, 2021 CADD_BIM Drawing Standards

5.1.1 Formula Typo Update in MX-CPG_CADD_BIM Standards Manual_Rev2

March 9, 2021 Mechanical Drawings and Specifications Updated 20 05 05 Mechanical Work General Instructions v1, 21 13 00 Fire Protection Sprinkler System v1, 23 21 18 Glycol solution Snow Melting system, 23 74 17 Roof Top Air Conditioning Unit  

5.1.1 Formula Typo Update

March 9, 2021 Electrical and Communication Standard Drawings and Specifications Launch Sample Mini-Hub/Platform Communication Room Layout and Ceiling Plan_165-SER-E-2003
March 9, 2021 Electrical and Communication Standard Drawings and Specifications

Launch Sample Communication Room Layout – Floor Plan and Reflected Ceiling Plan_165-SER-E-2002B

March 9, 2021

Electrical and Communication Standard Drawings and Specifications

Launch Sample Communication Room Layout – Notes and Legend_165-SER-E-2002A

March 9, 2021 Electrical and Communication Standard Drawings and Specifications Removed SER-001, SER-002, CR-002
March 9, 2021 Electrical and Communication Standard Drawings and Specifications Launch Sample Main Electrical Room Layout and Elevation, Sheet 2 of 2_165-SER-E-2001B
March 9, 2021

Electrical and Communication Standard Drawings and Specifications

Launch

Sample Electrical Room Layout – Legend and Notes, Sheet 1 of 2_165-SER-E-2001A

March 9, 2021 Electrical and Communication Standard Drawings and Specifications Launch Sample Single Line Diagram-3_165-SER-E-1003
March 9, 2021 Electrical and Communication Standard Drawings and Specifications Launch Sample Single Line Diagram-2_165-SER-E-1002
March 9, 2021

Electrical and Communication Standard Drawings and Specifications

Launch Sample Single Line Diagram-1_165-SER-E-1001
March 9, 2021

Electrical and Communication Standard Drawings and Specifications

Launch

Sample Side Platform - Typical Conduit Routing - 165-SER-E-4001

March 9, 2021

Electrical and Communication Standard Drawings and Specifications

Launch

Sample Island Platform - Typical Conduit Routing - 165-SER-E-4002

March 9, 2021

Electrical and Communication Standard Drawings and Specifications

Launch

Sample Electrical Trench Details - 1 of 2 - 165-SER-E-5001

March 9, 2021

Electrical and Communication Standard Drawings and Specifications

Launch

Sample Electrical Trench Details - 2 of 2 - 165-SER-E-5002

March 9, 2021

Electrical and Communication Standard Drawings and Specifications

Launch

Sample Pull Box/Manhole - Sizing - 165-SER-E-5003

February 25, 2021 Metrolinx Requirements for Writing Technical Standards Revised format to align better with the Style Guide.
February 09, 2021 Electrical & Communication Standard Drawings and Specs Remove the obsolete document "Insulation" from Electrical & Communication Standard Drawings and Specs
November 13, 2020 IT System Documents Remove IT System Documents since it is older version of Business Technology Standards
October 21, 2020 Asset Lifecycle Management Standards Launch Asset Lifecycle Management Standards
MX-ALM-STD-001, MX-ALM-STD-002, MX-ALM-STD-003
October 20, 2020 Business Technology Telecommunication and Systems Standards Launch Business Technology Telecommunication and Systems Standards - MX-BT-STD-001v0
October 08, 2020 Standard Drawings: Temporary Construction and Customer Experience Requirements for GO Facilities Launch Temporary Construction and Customer Experience Requirements for GO Facilities
August 18, 2020 RAMS Launch RAMS-5 RAM V&V (Verification and Validation) Process
August 18, 2020 RAMS Launch RAMS-4 RCA (Root Cause Analysis) Process
August 18, 2020 RAMS Launch RAMS-3 RAM (Reliability, Availability, Maintainability) Plan Process
August 18, 2020 RAMS  

Launch RAMS-2 FMECA (Failure Modes, Effects, and Criticality Analysis)

August 18, 2020 RAMS

Launch RAMS-1 FRACAS (Failure Reporting, Analysis, and Corrective Action System) Process

June 26, 2020 Typical Stair Configuration Removed Typical Stair Configuration
June 17, 2020 Signage Standard Drawings and Specifications Removed Standard Drawings and Specifications
June 17, 2020 Standard Drawing Sheets Updated Standard Drawing sheets
Mx_Title Page
Mx_Title Block
Mx_Sign Sheet
May 28, 2020 Architectural Level Boarding, REV 01 Updated Level Boarding Part 1: Passive Protection
May 15, 2020 Drainage and Vent Piping Specialties Specifications Updated Drainage and Vent Piping Specialties Specifications
April 28, 2020 Architectural Level Boarding Updated  Level Boarding Part 1: Passive Protection
April 22, 2020 Tactile Tile System Drawing Added
PC-002 Tactile Tile System - Platform Plan, Sections and Details
February 05, 2020 Light Pole Drawings Update Light Pole Drawings
February 05, 2020 Electrical Room  Drawings Update Electrical Room  Drawings
February 05, 2020 Electrical Wayside Power Drawing Package 1_Rev01 Update Electrical Wayside Power Drawing Package 1_Rev01
February 05, 2020 Mechanical Installation Detail Drawings M300_Rev01, M401_Rev01, M402_Rev01, M403_Rev01,M406_Rev01,  M800_Rev01 Update Mechanical Installation Detail Drawings M300_Rev01, M401_Rev01, M402_Rev01, M403_Rev01,M406_Rev01,  M800_Rev01
February 05, 2020 Plumbing Fixture_Rev02 Update Plumbing Fixture_Rev02
December 20, 2019 Level Boarding - Part 1_Passive Protection Added
Level Boarding - Part 1_Passive Protection
March 25, 2019 Elevator-Mini Hub Room V5 Added 
Elevator-Mini Hub Room V5
March 25, 2019 Lighting and Controls Specifications_Rev01 Updated
Lighting and Controls Specifications_Rev01
June 21, 2019

Topographic Features, Symbology and Conversion Standard

Added

Topographic Features, Symbology and Conversion Standard.pdf

June 21, 2019

MX_Topo_Legends_Rev0

Added

MX_Topo_Legends_Rev0.dgn

June 21, 2019

MX_TOPO_LEGENDS_REV0.dwg

Added

MX_TOPO_LEGENDS_REV0.dwg

June 21, 2019

MX_TOPO_LEGENDS_REV0-A1.pdf

Added

MX_TOPO_LEGENDS_REV0-A1.pdf

June 21, 2019

MX_TOPO_LTYPE_Acad_REV0

Added

MX_TOPO_LTYPE_Acad_REV0

June 21, 2019

MX_Topo_Seed2D_Rev0

Added

MX_Topo_Seed2D_Rev0

June 21, 2019

MX_Topo_Seed3D_Rev0      

Added

MX_Topo_Seed3D_Rev0      

June 21, 2019

MX_TOPO_TEMPLATE_REV0.dwg

Added

MX_TOPO_TEMPLATE_REV0.dwg

June 21, 2019

MX_TOPO_TEMPLATE_Rev0

Added

MX_TOPO_TEMPLATE_Rev0

June 21, 2019

MX_CADD_to_InRoads.mvba

Added

MX_CADD_to_InRoads.mvba

June 21, 2019

MX_Topo_to_InRoads_Key_Codes

Added

MX_Topo_to_InRoads_Key_Codes

June 21, 2019

MX_TOPO_to_InRoads_Surface.xin

Added

MX_TOPO_to_InRoads_Surface.xin

June 21, 2019

MX_TOPO_to_InRoads_TIW_Format.tiw

Added

MX_TOPO_to_InRoads_TIW_Format.tiw

June 21, 2019

Test Data Instructions.pdf

Added

Test Data Instructions.pdf

June 21, 2019

CPG_TOPO_LTYPE_Acad_REV0

Added

CPG_TOPO_LTYPE_Acad_REV0

June 21, 2019

MX_TOPO_LTYPE_Acad_REV0

Added

MX_TOPO_LTYPE_Acad_REV0

June 21, 2019

MX_Topo_Test_InRoads_Rev0_Contours and TIN

Added

MX_Topo_Test_InRoads_Rev0_Contours and TIN

June 21, 2019

MX_Topo_Test_InRoadsWithDTMErrors_Rev0_Mar20_19.dwg 

Added

MX_Topo_Test_InRoadsWithDTMErrors_Rev0_Mar20_19.dwg 

June 21, 2019

MX_Topo_Test_InRoadsWithDTMErrors_Rev0_Mar22_19_2InRoads.out 

Added

MX_Topo_Test_InRoadsWithDTMErrors_Rev0_Mar22_19_2InRoads.out

June 21, 2019

MX_Topo_Test_InRoadsWithDTMErrors_Rev0_Mar22_19_err_rpt.dwg

Added

MX_Topo_Test_InRoadsWithDTMErrors_Rev0_Mar22_19_err_rpt.dwg

March 8, 2019 Mini-platform Standard Drawings Updated
Mini-platform002
Mini-platform003
December 19, 2018 Mini Platform ../standard_drawings/architecural_mini platforms.aspx
December 18, 2018 Enabling Works ET Standards ../standard_drawings/Electrification/Enabling Works ET Standard (MX-ELEC TRACT EW-DW-2016-REV1).pdf
December 18, 2018 Electric Traction Enabling Works ../standard_drawings/Electrification/Electric Traction Enabling Works (MX-ELEC TRAC EW-SPEC-2016-REV1).pdf
November 14, 2018 Rail Corridor Raceway Requirements Added
Rail Corridor Raceway Requirements Guideline
October 15, 2018 Mechanical Installation Details Added updated
Mechanical Installation Details
October 15, 2018 Snowmelt Sensor Details Removed
Snowmelt Sensor Details and replaced with updated Mechanical Installation Details
September 20, 2018 BAS Performance Updated
BAS Performance Specification
September 20, 2018 Electrical Heating Cable and Control Updated
Electrical Heating Cable and Control Specification
September 20, 2018 Heaters Updated
Heaters Specification
September 20, 2018 Split Type Air to Air Heat Pumps Updated
Split Type Air to Air Heat Pumps Specification
September 20, 2018 Custom Made Air Handling Units Updated
Custom Made Air Handling Units Specification
September 20, 2018 Rooftop Air Conditioning Units Updated
Rooftop Air Conditioning Units Specification
September 20, 2018 Fuel-Fired Heaters Updated
Fuel-Fired Heaters Specification
September 20, 2018 Gas Fired Warm Air Furnace Updated
Gas Fired Warm Air Furnace Specification
September 20, 2018 Near Condensing Hot Water Boilers Updated
Near Condensing Hot Water Boilers Specification
September 20, 2018 Condensing Hot Water Boilers Updated
Condensing Hot Water Boilers Specification
September 20, 2018 Wall Hung Condensing Hot Water Boilers Condensing Hot Water Boilers (InFloorHeating) updated and replaced with
Wall Hung Condensing Hot Water Boilers Specification
September 20, 2018 HVAC Fans Updated
HVAC Fans Specification
September 20, 2018 Energy Recovery Ventilators Updated
Energy Recovery Ventilators Specification
September 20, 2018 HVAC Water Treatment Updated
HVAC Water Treatment Specification
September 20, 2018 Refrigerant Piping, Valves and Accessories Updated
Refrigerant Piping, Valves and Accessories Specification
September 20, 2018 Glycol Solution Snow Melting System Updated
Glycol Solution Snow Melting System Specification
September 20, 2018 Hydronic Radiant Floor Heating System Updated
Hydronic Radiant Floor Heating System Specification
September 20, 2018 HVAC Piping and Pumps Updated
HVAC Piping and Pumps Specification
September 20, 2018 Plumbing Fixtures Updated
Plumbing Fixtures Specification
September 20, 2018 Plumbing Equipment Updated
Plumbing Equipment Specification
September 20, 2018 General Service Compressed Air System Updated
General Service Compressed Air System Specification
September 20, 2018 Drainage and Vent Piping and Specialties Updated
Drainage and Vent Piping and Specialties Specification
September 20, 2018 Domestic Water Piping and Specialties Updated
Domestic Water Piping and Specialties Specification
September 20, 2018 Fire Pump Updated
Fire Pump Specification
September 20, 2018 Clean Agent Fire  Suppression System Updated
Clean Agent Fire  Suppression System Specification
September 20, 2018 Mechanical Insulation Updated
Mechanical Insulation Specification
September 20, 2018 Mechanical Work General Instructions Update
Mechanical Work General Instructions Specification
September 11, 2018 Snowmelt Design Guidelines and Specifications, Air Handling Units, In Floor Radiant Heating, Ductwork, Ductwork Accessories, Fans, Heat Recovery, Heaters, Plumbing Fixtures, Rooftop AC, Split Heat Pumps Removed old documents:
Snowmelt Design Guidelines and Specifications, Air Handling Units, In Floor Radiant Heating, Ductwork, Ductwork Accessories, Fans, Heat Recovery, Heaters, Plumbing Fixtures, Rooftop AC, Split Heat Pumps
September 11, 2018 Track Inspection Form - Derails RH, LH Turnout Moved to GO Transit Track Track Standards section
Inspection Form - Derails RH, LH Turnout
September 11, 2018 Crushed Track Ballast Specification Moved to GO Transit Track Track Standards section
Crushed Track Ballast Specification
September 10, 2018 Snow Melt Sensors Details Added
Snow Melt Sensors Details
September 10, 2018

BAS Performance

Added

BAS Performance Specification

September 10, 2018

Electrical Heating Cable and Control

Added

Electrical Heating Cable and Control Specification

September 10, 2018

Heaters

Added

Heaters Specification

September 10, 2018

Split Type Air to Air Heat Pumps

Added

Split Type Air to Air Heat Pumps Specification

September 10, 2018

Custom Made Air Handling Units

Added

Custom Made Air Handling Units Specification

September 10, 2018

Rooftop Air Conditioning Units

Added

Rooftop Air Conditioning Units Specification

September 10, 2018

Fuel-Fired Heaters

Added

Fuel-Fired Heaters Specification

September 10, 2018

Gas Fired Warm Air Furnace

Added

Gas Fired Warm Air Furnace Specification

September 10, 2018

Near Condensing Hot Water Boilers

Added

Near Condensing Hot Water Boilers Specification

September 10, 2018 Condensing Hot Water Boilers (InFloorHeating) Added
Condensing Hot Water Boilers (InFloorHeating) Specification
September 10, 2018

HVAC Fans

Added

HVAC Fans Specification

September 10, 2018

Energy Recovery Ventilators

Added

Energy Recovery Ventilators Specification

September 10, 2018

HVAC Water Treatment

Added

HVAC Water Treatment Specification

September 10, 2018

Refrigerant Piping, Valves and Accessories

Added

Refrigerant Piping, Valves and Accessories Specification

September 10, 2018

Glycol Solution Snow Melting System

Added

Glycol Solution Snow Melting System Specification

September 10, 2018

Hydronic Radiant Floor Heating

Added

Hydronic Radiant Floor Heating Specification

September 10, 2018

HVAC Piping and Pumps

Added

HVAC Piping and Pumps Specification

September 10, 2018

Plumbing Fixtures and Trim

Added

Plumbing Fixtures and Trim Specification

September 10, 2018

Plumbing Equipment

Added

Plumbing Equipment Specification

September 10, 2018

General Service Compressed Air System

Added

General Service Compressed Air System Specification

September 10, 2018

Drainage and Vent Piping and Specialties

Added

Drainage and Vent Piping and Specialties Specification

September 10, 2018

Domestic Water Piping and Specialties

Added

Domestic Water Piping and Specialties Specification

September 10, 2018

Fire Pump

Added

Fire Pump Specification

September 10, 2018

Clean Agent Fire  Suppression System

Added

Clean Agent Fire  Suppression System Specification

September 10, 2018

Mechanical Insulation

Added

Mechanical Insulation Specification

September 06, 2018 Metrolinx Survey Control in Transit Corridor Supplement Launch Metrolinx Survey Control in Transit Corridor Supplement
August 28, 2018 Air Terminal Units Updated Air Terminal Units
August 27, 2018 Electrical and Communication-Design Review Checklist Added
Electrical and Communication-Design Review Checklist
August 24, 2018 Wayside Power - Package 2 Added
Wayside Power Drawings - Package 2
August 24, 2018 Wayside Power - Package 1 Updated
Wayside Power Drawings - Package 1
August 20, 2018 CCTV Enclosures Removed
CCTV Enclosures
August 17, 2018 Humidity Control Equipment Added
Humidity Control Equipment
August 17, 2018 Condensing Hot Water Boilers Added
Condensing Hot Water Boilers
August 17, 2018 Flue Gas Vents Added
Flue Gas Vents
August 17, 2018 Air Terminals Added
Air Terminals
August 17, 2018 Natural Gas Piping System Added
Natural Gas Piping System
August 17, 2018 Fuel Oil System Added
Fuel Oil System
August 17, 2018 Fire Extinguishers Added
Fire Extinguishers
August 17, 2018 Fire Protection Sprinkler System Added
Fire Protection Sprinkler System
August 17, 2018 Fire Protection Standpipe System Added
Fire Protection Standpipe System
August 17, 2018 Firestopping and Smoke Seal System Added
Firestopping and Smoke Seal System
August 17, 2018 Testing, Adjusting and Balancing Added
Testing, Adjusting and Balancing
August 17, 2018 Mechanical work Commissioning Added
Mechanical work Commissioning
August 17, 2018 Demolition and Revision Works Added
Demolition and Revision Works
August 17, 2018 Basic Mechanical Materials and Methods Added
Basic Mechanical Materials and Methods
August 17, 2018 Mechanical Work General Instructions Added
Mechanical Work General Instructions
August 17, 2018 Lighting and Controls Added
Lighting and Controls
August 17, 2018 Outdoor Load Bank Added
Outdoor Load Bank
August 17, 2018 Transfer Switch Added
Transfer Switch
August 17, 2018 Uninterrupted Power Supply Added
Uninterrupted Power Supply
August 17, 2018 Inverter Rectifier and Charger Added
Inverter Rectifier and Charger
August 17, 2018 Backup Power Supply Generator Added
Backup Power Supply Generator
August 17, 2018 Circuit Breakers and Fuses Added
Circuit Breakers and Fuses
August 17, 2018 Motor Control Center Added
Motor Control Center
August 17, 2018 Metal-Clad Switchgears Added
Metal-Clad Switchgears
August 17, 2018 Raceway for Electrical Systems Added
Raceway for Electrical Systems
August 17, 2018 Splitter Boxes, Junction Boxes, Pullboxes and Cabinets Specifications Added
Splitter Boxes, Junction Boxes, Pullboxes and Cabinets Specifications
August 17, 2018 Electrical General Requirement Added
Electrical General Requirement
August 17, 2018 Electrical Conductors and Cables Updated
26 05 21 Electrical Conductors and Cables
August 17, 2018 Low Voltage Switchgears Updated
26 23 00 Low Voltage Switchgears
August 17, 2018 Switches and Disconnects Updated
26 28 23 Disconnect Switches
August 17, 2018 Communication Room Updated
Communication Room-Parking Structure-Room Layout and Ceiling Plan
Communication Room-Room Layout and Ceiling Plan
Hub Room-Room Layout and Ceiling Plan
August 17, 2018 Station  Electrical Room Updated
Station Electrical Room-Ceiling Plan
Station Electrical Room-Elevation 1 and 2
Station Electrical Room-Elevation 3 and 4
Station Electrical Room-Room Layout
August 17, 2018 Receptacles Updated
26 27 26 Receptacles and Plugs
August 17, 2018 Panel Boards Updated
26 24 13 Switchboards and Panelboards
August 17, 2018 Occupancy Sensors Updated
26 09 23 Occupancy Sensors
August 17, 2018 Motor Starters Updated
26 29 10 Motor Starters and Contactors
August 17, 2018 Transformers Updated
26 12 13 Liquid Filled Transformer
26 12 16 Dry Type Transformer
August 17, 2018 Light Standards Updated
12m Light Pole-Elevation and Details
12m Light Pole-Electrical Misc. Details
3m Light Pole-Elevation and Details
3m Pole-Hinged Pole-Standard Details
30m (High Mast)-Electrical Misc. Details
6m Light Pole-Hinged Pole-Standard Details
6m Light Pole-Elevation and Details
Lighting Pole-Standard Details
August 17, 2018 Air Filters Updated
23 41 00 Air Filters and Accessories
August 17, 2018 HVAC Air Distributions Updated
23 30 00 HVAC Air Distribution
August 17, 2018 Air Curtains Updated
23 33 45 Air Curtains
 
July 24, 2018 GO Transit Crushed Rock Track Ballast Specification Updated
GO Transit Track Standards Revision 01 (Crashed Rock Track Ballast Specification)
May 3, 2018 Interim Standards for the Selection of New Electronic Devices and Cables in Metrolinx Facilities (MX-ELEC EMI-SPEC-2017) Added
Interim Standards for the Selection of New Electronic Devices and Cables in Metrolinx Facilities (MX-ELEC EMI-SPEC-2017)
March 19, 2018 Static Signage - On-Street Bus Stop Signs Installation Added On-Street Bus Stop Signs Installation Method.pdf and On-Street Bus Stop Signs Custom Bracket.pdf
February 9, 2018 CADD_BIM Drawing Standards Launch CADD_BIM Drawing Standards
MX_CPG_Process_Map_Templates-V2.0
MX-CPG_BIM Execution Plan Template_Rev0
MX-CPG_BIM_ImpPlan_Rev0
MX-CPG_CADD_BIM Standards Manual_Rev1
MX-CPG_Information_Exchange_Worksheet_V2.1
December  8, 2017 Electrical Identification and Nomenclature Specification Added Specifications
June 8, 2017 ​Structures Passing Over Electrified Corridors (MX-ELEC STR-SPEC-2017-Rev3.0) Added Guidelines

Structures Passing Over Electrified Corridors (MX-ELEC STR-SPEC-2017-Rev3.0)
May 17, 2017 Motor Control Center Left Side Wiring Diagram Updated Motor Control Center Left Side Wiring Diagram
May 16, 2017 Bus Bay Guideline Added Drawing

Updated Bus Bay Guideline
February 2, 2017 Track Inspection Form Added Form

Track Inspection Form - Derails_RH,LH Turnout
January 26, 2017 Metrolinx Requirements for Writing Technical Standards Added Guidelines

Metrolinx Requirements for Writing Technical Standards
Quick Reference Guide
December 16, 2016 Electric Traction Enabling Works Added Performance Specification and Standard Drawings

MX-ELEC TRAC EW-SPEC-2016-REV0
MX-ELEC TRAC EW-DW-2016-REV0
October 18, 2016 GO-Bus Design Vehicle Added Enviro 500 Series

14m Super Low Height
12.8m LH Body
September 28, 2016 GO-Shelters Revised GO Bike Shelter
August 29, 2016 GO-Shelters Updated GO Shelter Designs and Specifications
August 25, 2016 Parking Garage Signage Updated Parking Garage Signage Design Requirements
August 25, 2016 Static Signage Specification Added Static Signage Specification

Section 10400
August 17, 2016 Standard Drawing Sheets Updated GO Standard Sign Sheets
July 28, 2016 Drawing Standards Added Drawing Standards

CI-0705 (Pages 621-643)
July 28, 2016 Grounding and Bonding Removed Grounding and Bonding Drawings

MXD-100-001
MXD-100-002
MXD-100-003
MXD-100-004
MXD-100-005
MXD-100-006
MXS-000-001
MXS-000-002
MXS-000-003
MXS-100-001
MXS-100-002 REV1
MXS-100-003
MXS-100-004 REV1
MXS-100-005
MXS-200-001
MXS-200-002
MXS-200-003 REV1
MXS-200-004
MXS-200-005
MXS-200-006 REV1
MXS-200-007 REV1MXS-200-008 REV1
MXS-200-009 REV1
MXS-200-010 REV1
MXS-200-011
MXS-200-012 REV1
July 25, 2016 GO Standard Bench Added Standard Bench Specification and Order Form
GO Transit Suite of Benches
GO Transit Order Form

July 25, 2016 GO Standards Waste Bin Added Waste Bin Specification
Waste Bin Specification (CA-296_GO May29)

July 14, 2016 GO-Track Ballast Added GO Track Ballast Specification

Crushed Rock Track Ballast Specification
June 17, 2016 GO-Shelters Added GO Shelter Designs and Specifications

GO-Shelter Bike DW-2016-Rev0
GO-Shelter Car Pool DW-2016-Rev0
GO-Shelter Passenger DW-2016-Rev0
GO-Shelter Spec-2016-Rev0
April 11, 2016 Mechanical Added Mechanical Design Guidelines

Air Curtains
Air Distribution Equipment
Air Filters
Duct Work and Accessories
Fans
Heat Recovery
Heaters
Plumbing Fixtures
Rooftop AC
Split Heat Pumps
Insulation
April 11, 2016 Architectural Added Retail Base Building Requirements
Retail Base Building Requirements

Content Moved from September 2015 Design Requirements Manual
Service Counter Guideline Requirements
Typical Stair Configuration
April 11, 2016 Communication Content Moved from DRM Appendix in Sept. 2015

IT - Systems Document
April 11, 2016 Signage Content Moved from September 2015 Design Requirements Manual

Parking Garage Design Signage Requirements
April 11, 2016 Electrical Added Electrical Design Guidelines

Low Voltage Transformers
Motor Starters
Occupancy Sensors
Panel Boards
Receptacles
Switches and Disconnects
Switch Gear
Two Way Communication
Wiring and Conduit

Content Moved from September 2015 Design Requirements Manual

PRESTO Installments Connectivity Guidelines
September 23 2015 Station ID Signage New Station ID signs
Primary Totem
Pylon ID
Parking Blade Sign
Pedestrian Totem
July 31, 2015 Service Counter Revised Drawings
Service Counter Drawings

May 11, 2015 BAS Performance Specification Added BAS Performance Specification
BAS Performance Specification
April 28, 2015 Grounding and Bonding Added Grounding and Bonding Standard and Directive Drawings
Grounding and Bonding
March 16, 2015 Wayside Power Added Optional Wayside Power Cabinet Layout
Optional Cabinet Layout
Optional Electrical Arrangement
Optional Bottom Covers
February 18 2015 Peaked and Vaulted Shelters Revised Barrier Free Button & Electrical Heater / Junction Box relocations
Rail and Bus Shelters

January 8 2015 Peaked and Vaulted Shelters Revised Rail and Bus Shelter Specification
January 8 2015 BRT Shelters Revised BRT Specification
October 1 2014 Bike Shelters Single Bike Shelter
Double Bike Shelter
August 18 2014 Standard Signature Sheet Updated USRC Signature Sheet
July 31 2014 Peaked and Vaulted Shelters Updated as per Revised Heaters and Revised Cross References

Peaked Shelters

Vaulted Shelters

July 31 2014 Distraction Pattern Updated As per CLAR-004

BRT-A-003
BRT-A-004
BRT-B-003
BRT-B-004
BRT-C-003
BRT-C-004
BIKE-002
BIKE-004

July 31 2014 Precast Curb Detectable Tile New Standard Drawing

PC-001

June 2 2014 GO Service Counter Revised Notations
Plan Typical-Equipment List

Section Typical-Receptacle Locations and Notes​
June 2 2014 Light Standards

Revised luminare notes on Light Standard Drawings:

6m Light Pole-Elevations and Details

6m Light Pole-Hinged Pole-Standard Details

12m Light Pole-Elevation and Details

30m (High Mast) Light Pole- Wiring Diagrams

May 14 2014 Standard Signature Sheet Updated Signature Sheets
May 2 2014 PRESTO

Updated as per CLAR- 002

PRESTO Standard Drawing PRES-002

PRESTO Standard Drawing PRES-003

 

March 12, 2014 GO Standard Drawings GO Service Area Standard Drawings SC-01 to SC-06 added:
SC-01
SC-02
SC-02a
SC-02b
SC-03
SC-03a
SC-03b
SC-04
SC-05
SC-06
January 17, 2014 GO Standard Drawings VMM 001 to VMM 010 removed from Standard Drawings
January 13, 2014 GO Standard Drawings Revised GO Standard Drawings with Disclaimer Note added.
November 26,2013 ​Standard Signature Drawing Sheets

Added USRC Sign Sheet

November 4, 2013 Standard Signature Drawing Sheets

Revised GO Standard Signature Drawings Sheets

Title Page

Railway Sign Sheet

PMPS Sign Sheet

Multimodal Sign Sheet

GTS Sign Sheet

Electrification Sign Sheet

EA Sign Sheet

September 5, 2013 Vaulted and Peaked Shelters Revised Ramp and Handrail details for Vaulted and Peaked Shelters
Vaulted Shelters
RBS-1A-001
RBS-1A-002
RBS-1A-003
RBS-1A-004
RBS-1A-005
RBS-1A-006
RBS-1A-007

Peaked Shelters
RBS-1B-001
RBS-1B-002
RBS-1B-003

RBS-1B-004
RBS-1B-005
RBS-1B-006
RBS-1B-007


August 30, 2013 Vaulted and Peaked Shelters Revised Colour Scheme for Vaulted and Peaked Shelters
Vaulted Shelters
RBS-1A-001
RBS-1A-002
RBS-1A-003
RBS-1A-004
RBS-1A-005
RBS-1A-006
RBS-1A-007

Peaked Shelters
RBS-1B-001
RBS-1B-002
RBS-1B-003

RBS-1B-004
RBS-1B-005
RBS-1B-006
RBS-1B-007


August 20, 2013 Electrical-Wayside Power WSP-004 Revised
August 8, 2013 Video Mounting Box   VMM-003 Revised
 VMM-005 and VMM-006 Revised
 VMM-010 Added
June 3, 2013 Video Mounting Box VMM 001 to VMM 009 added to Standard Drawings
April 8 2013 Rail and Bus Shelters Peaked and Vaulted roof shelters with ramps have been deleted from Standard.
Apr 1 2013 Electrical-Wayside Power WSP-001 to WSP-035 Wayside Drawing Package Updated
Feb 20 2013 Electrical-Wayside Power WSP-035-Decals and Signage Drawing Corrected

Feb 1 2013

Snowmelt Sensors Snowmelt Systems-Design Guidelines and Specifications.pdf  Link Corrected.
Snowmelt Sensors-Details.pdf  Added

Feb 1 2013

6m Hinged Light Pole LS 06H-001Added
LS 06H-002 Added
LS 06H-003 Added
LS 06H-004 Added
LS 06H-005 Added

Oct 1, 2012

6m Light Pole-Elevation and Details LS 06-001 Orient pole such that handholes point down length of platform ; Place cap on pole
Oct 1, 2012 Standard Drawing Sheets

Oct 1, 2012

BRT  Shelters  Performance Spec

Page 9 of 30: Added hardware info for shelter doors: Supply to each leaf one maximum security deadlock with lateral bolt swing. There are only external cylinders on these deadlocks. Lock type AR MS18500A - 24.6 mm BS. Cylinder type - Corbin 525A x Russwin 6D4 or 6D2 Keyway x 29 mm - C26D.

Oct 1, 2012 Rail and Bus Shelters  Performance Spec Page 13 of 22: Added hardware info for shelter doors: Supply to each leaf one maximum security deadlock with lateral bolt swing. There are only external cylinders on these deadlocks. Lock type AR MS18500A - 24.6 mm BS. Cylinder type - Corbin 525A x Russwin 6D4 or 6D2 Keyway x 29 mm - C26D.