Systems Engineering Assurance
The information contained within the drawings/specification is for design intent and information only. The information contained is a guideline only and are not intended as permit, tender, construction or contract documents. The consultant(s) are responsible for the final design and conformance with all applicable building codes, regulations and best industry practices. GO Transit/Metrolinx is not responsible for any errors or omissions as a result of the information contained within the drawings and specifications.
MX-SEA-TOR-001 - Metrolinx System Review Panel (SRP) Terms of Reference (ToR)
BSI Standard Railway Applications - The Specification and Demonstration of RAMS
MX-SEA-STD-001 FRACAS Process
MX-SEA-STD-002 FMECA Process
MX-SEA-STD-003 RAM Plan Process
MX-SEA-STD-004 RCA Process
MX-SEA-STD-005 RAM VV Process
MX-SEA-STD-006 RAMS Risk Assessment Process
MX-SEA-STD-100 RAMS Process Standard
MX-SEA-PD-104 Preliminary Railway Level System Definition PD
MX-SEA-TPL-104 Preliminary Railway Level System Definition Template
MX-SEA-PD-105 Preliminary System Definition PD
MX-SEA-TPL-105 Preliminary System Definition Template
MX-SEA-PD-106 System Definition PD
MX-SEA-TPL-106 System Definition Template
MX-SEA-PD-111 Risk Assessment Report PD
MX-SEA-TPL-111 Risk Assessment Report Template
MX-SEA-PD-112 Safety Requirements Specification PD
MX-SEA-TPL-112 Safety Requirements Specification Template
MX-SEA-PD-117 RAM Analysis Process PD
MX-SEA-PD-119 RAM Plan PD
MX-SEA-TPL-119 RAM Plan Template
MX-SEA-PD-120 RAM Analysis Report PD
MX-TPL-PD-120 RAM Analysis Report Template
MX-SEA-PD-121 RAM Requirements Specification PD
MX-SEA-TPL-121 RAM Requirements Specification Template
MX-SEA-PD-122 RAM Subsystem Requirements PD
MX-SEA-TPL-122 RAM Subsystem Requirements Template
MX-SEA-PD-123 RAM Validation Plan PD
MX-SEA-TPL-123 RAM Validation Plan Template
MX-SEA-PD-124 RAM Test Specification PD
MX-SEA-TPL-124 RAM Test Specification Template
MX-SEA-PD-125 RAM Validation Report PD
MX-SEA-TPL-125 RAM Validation Report Template
MX-SEA-PD-126 Failure Reporting Analysis and Corrective Action System PD
MX-SEA-PD-127 Operations Plan PD
MX-SEA-TPL-127 Operations Plan Template
MX-SEA-PD-128 Maintenance Plan PD
MX-SEA-TPL-128 Maintenance Plan Template
MX-SEA-PD-129 Training Plan PD
MX-SEA-TPL-129 Training Plan Template
MX-SEA-PD-130 Commissioning Plan PD
MX-SEA-TPL-130 Commissioning Plan Template
MX-SEA-PD-131 Acceptance Report PD
MX-SEA-TPL-131 Acceptance Report Template
MX-SEA-PD-132 Integration Plan PD
MX-SEA-TPL-132 Integration Plan Template
MX-SEA-PD-133 Integration Report PD
MX-SEA-TPL-133 Integration Report Template
MX-SEA-PD-138 RAM Requirements Validation Report PD
MX-SEA-TPL-138 RAM Requirements Validation Report Template
MX-SEA-PD-140 Safety Subsystem Requirements PD
MX-SEA-TPL-140 Safety Subsystem Requirements Template
MX-SEA-PD-142 Operations Procedure PD
MX-SEA-PD-143 Maintenance Procedure PD
MX-SEA-PD-144 Training Procedure PD
MX-SEA-PD-145 Commissioning Procedure PD
Systems Engineering Assurance Amendment Record