The information contained within the drawings/specification is for design intent and information only. The information contained is a guideline only and are not intended as permit, tender, construction or contract documents. The consultant(s) are responsible for the final design and conformance with all applicable building codes, regulations and best industry practices.  GO Transit/Metrolinx is not responsible for any errors or omissions as a result of the information contained within the drawings and specifications.

 

 

Spec. Ref. File Name pdf version
            Mechanical Installation Details
  Drawing List M-000 Drawing List
  Wall Mounted Non-Freeze Hose Bib Detail

M-100 Wall Mounted Non-Freeze Hose Bib Detail

  Post Mounted Hose Bib Detail M-101 Post Mounted Hose Bib Detail
  Drum Drip Detail M-102 Drum Drip Detail
  Submersible Pumps and Sump Pit Detail M-200 Submersible Pumps and Sump Pit Detail
  Pip Heat Tracing Details M-300 Pipe Heat Tracing Details

Snow Melting Tubing Assembled Platform Section (Concrete) M-400 Snow Melting Tubing Assembled Platform Section (Concrete)
  Snow Melting Tubing Assembled Platform Section (Concrete Mini-Platform) M-401 Snow Melting Tubing Assembled Platform Section (Concrete Mini-Platform)
  Snow Melting Tubing Assembled Platform Section (Asphalt) M-402 Snow Melting Tubing Assembled Platform Section (Asphalt)
  Snow Melting Tubing Assembled Platform Section (Asphalt Mini-Platform) M-403 Snow Melting Tubing Assembled Platform Section (Asphalt Mini-Platform)
  Tube Insulation Installation at Concrete Slab M-404 Tube Insulation Installation at Concrete Slab
  Manifold Pit Piping M-405 Manifold Pit Piping
  Snow and Ice Sensor Installation M-406 Snow and Ice Sensor Installation
  Sample Boiler Room Layout M-407 Sample Boiler Room Layout
  Generator Room Ventilation System M-700 Generator Room Ventilation System
  Generator Room Ventilation System M-701 Generator Room Ventilation System
  BAS Architecture M-800 BAS Architecture