Signals & Communications Standards Amendment Record |
Date
|
Subject
|
Description/Dwg Ref.
|
February 8, 2024 |
Signals Standards Bulletin #001 |
New bulletin added:
Signals Standards Bulletin #001
- Signals Standards Bulletin for GI and SCP
- Updated Bonds and Battery requirements. |
September 14, 2023 |
Signals and Communications Standards |
New bulletin added:
FAE-001 At Grade Pedestrian Crossings Appendix C DRM Content |
July 4, 2023 |
Signals and Communications Standards |
New standard added:
GO Bus Radio Devices Installation Standard
GO Site Radio Devices Installation Standard |
July 7, 2022 |
Signals and Communications Standards |
Launch
GO Transit Grade Crossing Design Standard v0 |
June 2, 2021 |
Signals and Communications Standards |
Wrong document were uploaded on May 05, 2021 and replaced with
34-42-03 Wayside Signal Structures Specification |
May 5, 2021 |
Signals and Communications Standards |
Revise
RC-0506-03SIG-04 Signal Sighting Distance Design Standards |
May 5, 2021 |
Signals and Communications Standards |
Revise
GO Transit Signals and Communications Standards - Signal Design Manual |
May 5, 2021 |
Signals and Communications Standards |
Revise
34-42-04 Overhead Signal Structures Specification |
May 5, 2021 |
Signals and Communications Standards |
Revise
34-42-03 Wayside Signal Structures Specification |
May 5, 2021 |
Signals and Communications Standards |
Launch
SCP-10 Reference Drawing Rev0 |
May 5, 2021 |
Signals and Communications Standards |
Launch
SCP-9 Reference Drawing Rev0 |
May 5, 2021 |
Codes of Practice (SCP) |
Revise
Codes of Practice (SCP) |
May 5, 2021 |
General Instructions (GI) |
Revise
General Instruction (GI) |
July 30, 2020 |
Signals and Communications Standards |
Launch
GO Transit Signals and Communications Standards - Signals Design Manual |
April 29, 2020 |
Signals and Communications Standards |
Updated
34 42 01 Aluminum Hose Specification
34 42 02 Wayside LED Signal Module Specification
34 42 03 Wayside Signal Structure Specification
34 42 04 Overhead Signal structure specification
34 42 05 Hot Air Switch Clearing Device Specification
RC-0506-03SIG-04 Signal Sighting Distance Design Standrads
|
April 17, 2020 |
Signals and Communications Standards |
Added specifications
34 42 01 Aluminum Hose Specification
34 42 02 Wayside LED Signal Module Specification
34 42 03 Wayside Signal Structures Specification
34
42 04 Overhead Signal Structures Specification
34 42 05 Hot Air Switch Clearing Device Specification |
November 20, 2019 |
General Instructions (GI) |
Launch
General Instructions (GI) |
November 20, 2019 |
Codes of Practice (SCP) |
Launce
Codes of Practice |